Tolok’s Structure Takes Shape
Imagine waking up to the Caribbean breeze, surrounded by cutting-edge architectural design and high-quality finishes. This vision is getting closer to reality at Tolok, our exclusive development in Cozumel. Today, we share the construction progress and key milestones in the building of this project.
Completed Phases: A Solid Foundation for a Grand Project
In recent months, our engineering and construction team has worked tirelessly to ensure that Tolok is built to the highest standards. Here are some of the milestones achieved:
1. Foundation Completion
The structural base is fully completed, ensuring the building’s stability and durability. High-strength materials have been used to withstand coastal weather conditions and guarantee a solid construction.
2. Main Structure in Progress
The building’s structure is currently being assembled, with 70% of the levels already erected. While much progress has been made, the structural framework is still under construction as we work towards completing this crucial phase.
3. Installations Underway
Plumbing, electrical, and air conditioning systems are being installed, ensuring that each unit offers the best conditions for comfort and energy efficiency.
What’s Next: Structural Completion and Finishes
In the coming months, we will focus on:
- Completing the final stages of the structural assembly.
- Starting interior and common area finishes.
- Implementing landscaping designs for the rooftop garden and green areas.
Each milestone brings us closer to the delivery of Tolok, a space where design, comfort, and nature blend in perfect harmony.
Stay Informed
We will continue sharing updates on Tolok’s construction progress. If you’d like to learn more or receive exclusive information, contact us or visit our website.
The future of Tolok is underway, and you can be a part of it!